About the Project

Construction and design of Schneider’s Electrical Microgrid Lab, which included a 5MVA substation. This lab was designed to test distribution grade inverters for large solar panel fields. Completed the project in under four months which contained over 70,000lb of wiring and over 300,000lb of test equipment and a 1,800 point control structure.

Project Details

Completed: please confirm
Scope: $2.8 million